Location: Ely, Cambridgeshire
Client: Fenland Glasshouse Limited
Project overview
Scope of our work:
To meet the heating and cooling requirements of the cucumber and tomato production area at this £5m packhouse, we designed and installed two industrial HVAC units which protect product quality during storage and packaging.
For the cucumber cooling process, we also installed two glycol coolers on a close approach temperature as this allowed the facility to maintain maximum relative humidity and, therefore, the produce weight.
To make adjustments and monitor performance, we also installed a full site Building Management System (BMS) with remote access.